DOS GROUP is currently running an Architectural Contest for the outer shell design of a 1Mw Biomass Power Plant. DOS ENERGY, member of DOS GROUP, will construct several Biomass Power Plants in Industrial Zones of Attica/Greece and is looking for fresh architectural ideas that could integrate smoothly a Biomass Power Plant on the region and turn the Biomass Power Plant to a building that upgrades the aesthetics of the industrial zone. The competition is exciting as 19 Group of Architects have submitted their proposals and in the coming days 10 of them will enter the final stage for the selection of the winner.

The winner of the Architectural Contest will win a contract to materialize with DOS ENERGY the proposal his/her team has submitted.

You can see all the proposals here.